刀闸阀显著提升氧化铝精炼过程中的性能与安全性
The refinery experienced ongoing leakage problems with the existing knife gate valves installed on the thickener discharge service—creating severe safety concerns. Leakage during valve operation was severe enough that a safety exclusion zone of approximately 50 feet | 15 meters (spanning multiple plant levels) had to be maintained around the equipment to protect site personnel.
博雷的解决方案包括
由博雷员工支持和推动的发展进步为我们的客户带来了持续的成功。
阅读他们的故事,了解博雷如何能够改变和协助您的公司。
阅读我们客户的成功故事,了解博雷如何改变和协助您的公司。
本文档还可以提供以下语言版本: